Yard Machines 650 Series Instrukcja Obsługi

Przeglądaj online lub pobierz Instrukcja Obsługi dla Dmuchawy / suszarki powietrza Yard Machines 650 Series. Yard Machines 650 Series Technical data Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 122
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów

Podsumowanie treści

Strona 1 - Engineering Manual

Relion® Protection and Control650 seriesEngineering Manual

Strona 2

1.3 Product documentation1.3.1 Product documentation setPlanning & purchaseEngineeringInstallingCommissioningOperationMaintenanceDecommissioning

Strona 3 - Product version: 1.1

1. Select the station in the plant structure.2. Right-click the station and select Import ...3. Select the file to be imported from the open standard

Strona 4 - Copyright

Be sure to set the setting Operation to On in PST for allincluded GOOSE receiving function blocks in the applicationconfiguration to enable GOOSE comm

Strona 5 - Disclaimer

7.5.2 Importing ICD or CID filesProcedure to import a complete ICD file or CID file:1. Select an existing IED to import IEC 61850 files.2. Select the

Strona 6 - Conformity

However it is possible to make a configuration change in one IED, withoutaffecting the communication engineering. For example, when the ApplicationCon

Strona 8

Section 8 IEC 60870-5-103 communicationengineering8.1 Engineering in PCM600The Application Configuration tool (ACT) and the Parameter Setting tool (

Strona 10 - 1.3 Product documentation

Section 9 DNP3 communication engineering9.1 Signal configuration user informationBasic knowledge about DNP3 and the used definitions are requiredto

Strona 11 - 1.3.3 Related documents

9.2 Configuring DNP3 protocol signals1. Save the actual project configuration in PCM600 to make all signals visible forCMT.Direct configured hardware

Strona 12 - Section 1 1MRK 511 245-UEN

• The right window shows tabs for possible communication channels.• The left window has a drop down menu for signal selection and buttonsfor signal mo

Strona 13 - 1.4 Symbols and conventions

well as verifying settings by secondary injection. The manual describes the processof testing an IED in a substation which is not in service. The chap

Strona 14

Content changes in the DNP3 container are marked with a star atthe end of the name, see Figure 77. The star indicates that changesin the container hav

Strona 15

IEC08000363.vsdIEC08000363 V1 ENFigure 79: CMT: Set Index menu3. Define the Starting index for this group and click OK.Procedure to set class configur

Strona 16

1. Click in the Class field of the signal. A new window Select Class opens wherethe user classifies the signal.2. Select the signal classes and choose

Strona 17

Section 10 GlossaryAC Alternating currentACT Application configuration tool within PCM600A/D converter Analog-to-digital converterADBS Amplitude dead

Strona 18

CPU Central processor unitCR Carrier receiveCRC Cyclic redundancy checkCROB Control relay output blockCS Carrier sendCT Current transformerCVT Capacit

Strona 19

FOX 20 Modular 20 channel telecommunication system for speech,data and protection signalsFOX 512/515 Access multiplexerFOX 6Plus Compact time-division

Strona 20

I-GIS Intelligent gas-insulated switchgearInstance When several occurrences of the same function are availablein the IED, they are referred to as inst

Strona 21 - 2.1 Introduction

apparent impedance to the fault applied to the balance point,that is, the set reach. The relay “sees” the fault but perhaps itshould not have seen it.

Strona 22 - 2.2 IED engineering process

SMA connector Subminiature version A, A threaded connector with constantimpedance.SMT Signal matrix tool within PCM600SMS Station monitoring systemSNT

Strona 23 - Engineering tool set

dissemination of standard frequencies and time signals. UTCis derived from International Atomic Time (TAI) by theaddition of a whole number of "l

Strona 24 - Section 2 1MRK 511 245-UEN

Documents related to REB650 Identity numberProduct Guide, configured 1MRK 505 265-BENType test certificate 1MRK 505 265-TEN Documents related to REL

Strona 27 - Section 3

Contact usABB ABSubstation Automation ProductsSE-721 59 Västerås, SwedenPhone +46 (0) 21 32 50 00Fax +46 (0) 21 14 69 18www.abb.com/substationautomati

Strona 28

650 series manuals Identity numberCommunication protocol manual, DNP3 1MRK 511 241-UENCommunication protocol manual, IEC 61850 1MRK 511 242-UENCommuni

Strona 29 - Setting up a project

• LHMI messages are shown in Courier font, for example:To save the changes in non-volatile memory, select Yes and press .• Parameter names are shown

Strona 30 - Section 4 1MRK 511 245-UEN

Table 2: Backup protection functionsIEC 61850 / Functionblock nameANSI Function description Current protectionPHPIOC 50 Instantaneous phase overcu

Strona 31

Table 3: Control and monitoring functionsIEC 61850 / Functionblock nameANSI Function description ControlSESRSYN 25 Synchrocheck, energizing check

Strona 32

IEC 61850 / Functionblock nameANSI Function description Secondary system supervisionCCSRDIF 87 Current circuit supervisionSDDRFUF Fuse failure s

Strona 33 - IEC09000358-1-en.vsd

IEC 61850 / Functionblock nameANSI Function description BxRBDR Binary input signalsSPGGIO IEC61850 generic communication I/O functionsSP16GGIO

Strona 34 - IEC09000658-1-en.vsd

IEC 61850 / Function blocknameANSI Function description GOOSEVCTRCONF GOOSE VCTR configuration for send and receiveVCTRSEND Voltage control se

Strona 36 - IEC08000365-2-en.vsd

IEC 61850 / Functionblock nameFunction descriptionSMAI_20_1 -SMAI_20_12Signal Matrix for analog inputs3PHSUM Summation block 3 phaseGBASVAL Global bas

Strona 37

Section 2 Engineering tool set2.1 IntroductionThe structure of a monitoring and control system for electrical substations has aprinciple structure a

Strona 38 - IEC08000374.vsd

PCM600 communicates with the bay IEDs via an Ethernet connection. Theconnection allows to reading and writing all configuration data needed for proper

Strona 39

• IED engineering management• Organizing the bay IEDs in the structure of the substation by definingvoltage levels and bays below the substation. PCM6

Strona 40 - IEC09000661-1-en.vsd

IEC08000100.vsdPCM600IED Engineering ManagementProjectACTSMTHWTGDEPSTCommunication ManagementCMTOperator Disturbance Record ManagementDRHService Manag

Strona 41 - IEC09000662-1-en.vsd

Section 3 Engineering process3.1 WorkflowIEC08000122.vsdMake GOOSE connectionsExport SCL files from PCM600Import SCL files to CCT600 and do signal e

Strona 42 - IEC09000682-1-en.vsd

The described sequence in Figure 4 is a proposal based on practical experience anddependencies of the steps. It is possible to do a different sequence

Strona 43 - IEC09000664-2-en.vsd

• The engineering steps are protocol dependent.• Use the communication management tool (CMT) for DNP3 engineering.• Use a station configuration tool,

Strona 45 - IEC08000366.vsd

Section 4 Setting up a project4.1 PCM600 operates on projectsA typical project in PCM600 contains a plant structure including one or severalIED obje

Strona 46 - IEC08000367.vsd

Document ID: 1MRK 511 245-UENIssued: February 2011Revision: -Product version: 1.1© Copyright 2011 ABB. All rights reserved

Strona 47 - IEC09000644-1-en.vsd

4.3 Setting up communication between PCM600 andthe IEDThe communication between the IED and PCM600 is independent of the usedcommunication protocol w

Strona 48 - IEC08000121-2-en.vsd

IP address of the front port, if the front and rear port are set to thesame subnet.Setting up the PC or workstation for point-to-point access to IEDsf

Strona 49 - 4.7 Setting technical key

IEC09000355-1-en.vsdIEC09000355 V1 ENFigure 6: Select: Network connections2. Select Properties in the status window.IEC09000356-1-en.vsdIEC09000356 V1

Strona 50

IEC09000357-1-en.vsdIEC09000357 V1 ENFigure 8: Select the TCP/IP protocol and open Properties4. Select Obtain an IP address automatically if the param

Strona 51

IEC09000658-1-en.vsdIEC09000658 V1 ENFigure 10: Select: Use the following IP address6. Close all open windows and start PCM600.Setting up the PC to ac

Strona 52

Extensions of the exported project file is *.pcmp and those files are only used forexporting and importing the projects between PCM600s.Creating a new

Strona 53 - Section 5

Build up the plant structure according to the project requirements. PCM600 offersseveral levels to build the hierarchical order from Center down to th

Strona 54 - Section 5 1MRK 511 245-UEN

4.5.1 IEC 61850 naming conventions to identify an IEDThis section is only valid when the IEC 61850 standard is used for station buscommunication. Acc

Strona 55

IEC08000374.vsdIEC08000374 V1 ENFigure 13: PCM600: IEC 61850 signal designation concept4.6 Inserting an IEDThe context menu or the Object Types view

Strona 56

with the IED. The offline configuration in PCM600 can be synchronizedwith the physical IED at a later state by connecting the IED to PCM600.It is poss

Strona 57

CopyrightThis document and parts thereof must not be reproduced or copied without writtenpermission from ABB, and the contents thereof must not be imp

Strona 58

IEC09000660-1-en.vsdIEC09000660 V1 ENFigure 15: PCM600: Communication mode selection wizard4. Select the IED Communication protocol, see Figure 16.IEC

Strona 59

IEC09000662-1-en.vsdIEC09000662 V1 ENFigure 17: PCM600: Communication port and IP address6. Cross check that the IED, whose IP address has been insert

Strona 60 - 5.1.7 Hardware channels

IEC09000663-2-en.vsdIEC09000663 V2 ENFigure 18: PCM600: IED Version detection8. Click next to open the Housing Selection Page and select the housing a

Strona 61 - 5.1.8 Validation

IED Type, IED Version, IP Address of IED and Order Number,see Figure 20. It is possible to Cancel the insertion or confirm theconfiguration and do the

Strona 62

specific file is available then select the No Order Specific File option, see Figure22.IEC09000665-2-en.vsdIEC09000665 V2 ENFigure 21: PCM600: IED Ver

Strona 63

Inserting an IED from the template libraryAn IED in the plant structure can be exported as a template (*.pcmt). The user canbuild up a template librar

Strona 64

IEC08000367.vsdIEC08000367 V1 ENFigure 24: PCM600: IED Template Properties5. Click Delete Template to delete the template, click Import Template to im

Strona 65

1. Right-click the bay and select Import ... to select the IED configuration file(*.pcmi) , see Figure 25.IEC09000644-1-en.vsdIEC09000644 V1 ENFigure

Strona 66

IEC09000662-1-en.vsdIEC09000662 V1 ENFigure 26: Alternative 1: IP address via first Wizard window• Via the IP address property of the IED in the Objec

Strona 67 - Local HMI engineering

1. Select the IED to enter the IP address.2. Open the Object Properties window.3. Place the cursor in the IP address row and enter the IP address.The

Strona 68 - Section 6 1MRK 511 245-UEN

DisclaimerThe data, examples and diagrams in this manual are included solely for the conceptor product description and are not to be deemed as a state

Strona 69

Be sure that the IED object in PCM600 has the same IP address asthe physical IED, which is intended to be connected through thetechnical key concept.T

Strona 70

IEC09000380-1-en.vsdIEC09000380 V1 ENFigure 30: PCM600: Technical key editorUsing the Technical Key Editor the following selections are possible.• use

Strona 72 - IEC09000657-1-en.vsd

Section 5 Protection and control engineering5.1 Creating an application configuration with ACT5.1.1 OverviewACT is used to create the application c

Strona 73

SMT is not supporting signals of integer type or groupsignals. So, even if these types of signals are set asvisible for SMT, they will not be shown in

Strona 74

Function blocks with disconnected outputs are not executing andhence may show improper values on the outputs.IEC08000258.vsd137 8 9171612111025 615141

Strona 75

A function block can contain more signals than needed in that application part. Asignal that is not used in a particular application is possible to hi

Strona 76

IEC08000269.vsdIEC08000269 V1 ENFigure 32: ACT: function block organization parametersA minus sign in front of the cycle time, for example -200ms,indi

Strona 77

For the same time point, faster cycle times are executed first.A function block that is placed after a function block in theexecution flow must have t

Strona 78

blocks in group 3 must have a higher execution order than the main function blockin group 2.5.1.5 Configuration parametersConfiguration parameters ar

Strona 79

ConformityThis product complies with the directive of the Council of the EuropeanCommunities on the approximation of the laws of the Member States rel

Strona 80

5.1.7 Hardware channelsHardware channels can only be connected to a function block input or output. Ahardware connection can be established in ACT or

Strona 81

5.1.8 ValidationValidation checks the application configuration on errors about the rules andrestrictions defined for doing a MainApplication on thre

Strona 82

IEC09000614_2_en.vsdIEC09000614 V2 ENFigure 38: ACT: Validation on demandValidation when writing to the IEDWhen writing the application configuration

Strona 83

Do not make PST read/write operation to IED when disturbancerecorder is storing data since that causes PCM600 to report that theIED is offline or havi

Strona 84

IEC08000173_2_en.vsdBIOBIOTRMFBsGOOSE InputsGOOSE FBs for binary and analog data, interlocking communicationand voltage control IEC 61850SMAIFBsIEC080

Strona 85

IEC08000150-2-en.vsdIEC08000150 V2 ENFigure 40: SMT Connection between binary input channels to binary inputsignalsDepending on the IED capability, SM

Strona 87

Section 6 Local HMI engineering6.1 LED and function key engineering6.1.1 Local HMI engineering processThe engineering process of the LEDLHMI involv

Strona 88 - 6.3 Events and indications

• To use the function keys and LEDs on LHMI it is needed to insert thecorresponding special function blocks for these operation element groups.• The f

Strona 89

IEC08000375 V1 ENFigure 42: Local HMI: Placement of local HMI operation elementsFunction block LEDGEN• Handles an external acknowledge signal as sourc

Strona 90

Table of contentsSection 1 Introduction...3This manual...

Strona 91

'Multifunction' key [a] to toggle between the three groups or the 'Clear' key [b]to acknowledge or reset the LEDs.• Only the progr

Strona 92

IEC09000656-1-en.vsdIEC09000656 V1 ENFigure 43: LHMI: Function key operation modeThe LEDs have a number of different operation modes, see Figure 44:•

Strona 93

• The same as LatchedAck-F-S but the LED starts with steady state andflashes after acknowledgment.• LatchedColl-S• The LED illuminates in all cases in

Strona 94

LED operation mode Follow-SIEC08000395.vsd= Steady = FlashIllumination => RYGRYGSignalsLEDIEC08000395 V1 ENFigure 45: LHMI: LED operation mode Foll

Strona 95 - 7.3.1 Exporting SCD files

LED operation mode LatchedAck-F-SIEC08000397.vsdRYGRYGSignalsLEDAck= Steady = FlashIllumination => IEC08000397 V1 ENFigure 47: LHMI: LED operation

Strona 96

• All colors (signals) are acknowledged and they will illuminate in steadystate.• Incoming additional signals with lower priority will illuminate when

Strona 97

This mode catches a signal change to ON and the LED stays ON until the operatorresets the LEDs for this group.If the signal is still ON when a reset L

Strona 98

IEC08000401.vsd= Steady = FlashIllumination => Man-ResetS1S2S3S4tMaxtRestartS1LEDS2LEDS3LEDS4LEDAuto-ResetIEC08000401 V1 ENFigure 52: LHMI LED oper

Strona 99 - 7.5.1 Importing SCD files

IEC08000123.vsdSymbol librarywindowIED HMIdisplay windowHMI displaywindow pagesRegard the squence of pagesIEC08000123 V1 ENFigure 53: GDE: Screen imag

Strona 100 - Section 7 1MRK 511 245-UEN

• Several single line diagrams can be created for one bay.• The IED supports one bay.• The sequence order of the HMI pages in the Graphical Display Ed

Strona 101 - Section 7

Setting configuration and setting parameters in PST...56Connecting signals in SMT...

Strona 102

IEC08000127.vsdIEC08000127 V1 ENFigure 54: GDE: Dynamic Text symbolsThe standard (IEC or ANSI) for the symbols and the selection of the font size fort

Strona 103

Doing Link to draw linesThe line width has to fit to the line width used for the symbols. The standard size is2. Choose the line width in a selection

Strona 104

6.2.2 Supported single-line diagram symbolsTable 6: Supported symbolsIEC Symbol Name Node Type IEC SymbolDefinitionsANSI Y32.2/IEEE 315SymbolDefiniti

Strona 105 - 8.1 Engineering in PCM600

IEC Symbol Name Node Type IEC SymbolDefinitionsANSI Y32.2/IEEE 315SymbolDefinitionsCategoryIsolator, 11 = Undefined 3 SwitchgearBreaker, 00 = Middle p

Strona 106

IEC Symbol Name Node Type IEC SymbolDefinitionsANSI Y32.2/IEEE 315SymbolDefinitionsCategoryIsolator2, 00 = Middle position 32 SwitchgearIsolator2, 01

Strona 107 - Section 9

IEC Symbol Name Node Type IEC SymbolDefinitionsANSI Y32.2/IEEE 315SymbolDefinitionsCategorySelect button, 11 = Undefined 30 TextsIndication button, 00

Strona 108 - Section 9 1MRK 511 245-UEN

IEC09000666-1-en.vsdIEC09000666 V1 ENFigure 56: GDE: Establish a dynamic object linkLinking process objectsTo describe a process object within an IED

Strona 109

1. Right-click the apparatus symbol and select Select Input Signal. A list ofengineered switch control application function blocks opens, see Figure 5

Strona 110

en05000611.vsdIEC05000611 V1 ENFigure 58: GDE: Object properties windows for text insertionThe single line diagram screen can display different values

Strona 111 - 9.3.1 Configuring DNP3 class

Detailed information about disturbance report subfunctions is foundin the technical manual.1MRK 511 245-UEN - Section 6Local HMI engineering650 series

Strona 112

Section 1 Introduction1.1 This manualThe engineering manual contains instructions on how to engineer the IEDs usingthe different tools in PCM600. Th

Strona 114 - Glossary

Section 7 IEC 61850 communication engineering7.1 IEC 61850 interface in the IED and toolsFor more information on the implementation of IEC 61850stan

Strona 115 - Section 10

IEC08000364.vsdLNGOOSESendCommunication handlerIEC 61850 protocolCommandsEventhandlerEventqueueCommand / IN / OUT interface AF partGOOSE SendGOOSE Rec

Strona 116

en05000830.vsdIED 3SendData-setReceiveReceiveLNLNLNLNLNIED 2SendData-setReceiveReceiveLNLNLNLNIED 1SendData-setReceiveReceiveLNLNLNLNLNLNIEC 61850 Sub

Strona 117

• Capability description of the IED in logical nodes and their data. Noinformation about communication configuration, for example, is included.• An IE

Strona 118

A short form of a typical sequence is shown in Figure 62 when a complete stationis exported as a SCD file.1. Export SCL files from PCM600. In the scen

Strona 119

1. Select the station in the plant structure, see Figure 63.IEC08000415.vsdStationIEC08000415 V1 ENFigure 63: IEC 61850: Export SCD step 12. Right-cli

Strona 120

IEC08000416.vsdIEC08000416 V1 ENFigure 65: IEC 61850: Export IED file type selection3. The SCL Export Options window opens.4. Select Export Private Se

Strona 121

IEC09000628-1-en.vsdIEC09000628 V1 ENFigure 67: CCT600 Import SCL file3. Do vertical communication engineering (monitoring direction).3.1. Check the d

Strona 122 - Contact us

The data set for GOOSE may contain signals on dataattribute level or on FCDA level. The latter is also calledstructured GOOSE.3.3. Configure additiona

Komentarze do niniejszej Instrukcji

Brak uwag